# Axis 3
Table-L 161"
Table-W 86"
Max Table Load Capacity 28,600 lb
X-Axis (Longitudinal Travel) 86.7"
Y-Axis (Cross Travel)161.4"
Z-Axis (Vertical Travel) 40"
X-Axis Rapid Traverse Rate 787 in/min.
Y-Axis Rapid Traverse Rate 787 in/min.
Z-Axis Rapid Traverse Rate 590 in/min.
Spindle Power 35 hp
Max Spindle Speed 6,000 RPM
Spindle Taper CAT 50
Automatic Tool Changer Capacity (ATC) 40
Machine Hours 40
Weight 70,400 lbs
Dimensions 455" x 205" x 170"
Fanuc OiMF CNC Control, IGB Data Server, Renishaw RTS/RMP40 Probing System, 300 PSI Coolant Through Spindle, Through Spindle Air Blast, Dual Augers and Chip Conveyor, Box Ways. Machine has 40 Cutting Hours!
This equipment is currently unavailable. Similar equipment available now is shown below.
We use cookies to improve your experience. Privacy Policy.
We use different types of cookies to optimize your experience on our website. You can choose which types of cookies to allow and change your preferences at any time. Please note that disabling certain cookies may affect your experience on the website. You can learn more about how we use cookies by visiting our Privacy Policy.
These cookies are necessary for the core functionality of our website and some of its features, such as access to secure areas.
These cookies are used to enhance the performance and functionality of our website but are non-essential. Without these cookies, certain functionality may become unavailable.
These cookies gather information to help us understand site usage, measure marketing effectiveness, and improve your experience.
These cookies help improve ad relevance, prevent repetitive ads, ensure proper display, and may be used to tailor advertising to your interests.